Aguilar Solar Park: Development, Engineering and Execution
Escacena del Campo – Huelva
Technology: Fixed
2100 kWp
Irradia Energía carries out the complete development of the project, which includes the engineering, development, commercialization and construction of a photovoltaic solar park in Escacena del Campo (Huelva). Construction began in November 2007 and the park was connected in July 2008. The wind farm has a capacity of 2.1 MWp.