Alonsolar Morón Solar Park: Promotion, Engineering and Execution

Alonsolar Morón Solar Park: Promotion, Engineering and Execution Moron de la Frontera – Seville Irradia Energía is carrying out the complete development of the project, which includes the engineering, development, commercialization and construction of a 2.1 MWp solar farm located in Morón de la Frontera (Seville). Construction began in February 2008 and connection was made…

Leer el artículo

Marchena Solar Park: Promotion, Engineering and Execution

Marchena Solar Park: Promotion, Engineering and Execution Marchena – Seville 540 kWp Irradia Energía carries out the complete development of the project, including engineering, development, commercialization and construction. Construction began in June 2008 and connection was made in September 2008. The solar farm has a capacity of 540 kWp and is located in Marchena (Seville).

Leer el artículo

Aguilar Solar Park: Development, Engineering and Execution

Aguilar Solar Park: Development, Engineering and Execution Escacena del Campo – Huelva Technology: Fixed 2100 kWp Irradia Energía carries out the complete development of the project, which includes the engineering, development, commercialization and construction of a photovoltaic solar park in Escacena del Campo (Huelva). Construction began in November 2007 and the park was connected in…

Leer el artículo