Alcalá del Río Solar Park

Alcalá del Río Solar Park: Engineering, processing and construction management. Alcalá del Río – Seville Irradia Energía carries out the complete development of the project, including engineering, development, commercialization and construction. Construction began in June 2008 and connection was made in September 2008. The solar farm has a capacity of 540 kWp and is located…

Leer el artículo

R+D+i Project: PV Ontime

R+D+i Project: PV Ontime PV ON-TIME aims to achieve the experimental development of a new prototype based on an intelligent system for the production, management, control and storage of on-time electrical energy that incorporates a sensor network and advanced telecommunications, aimed at large photovoltaic plants, both nationally and internationally. This intelligent system will have the…

Leer el artículo

Energy audit of the thermal installations of the municipal swimming pool of Castilleja de la Cuesta.

Energy audit of the thermal installations of the Castilleja de la Cuesta municipal swimming pool. Castilleja de la Cuesta – Seville Preparation of a technical report on the operating conditions of the hot water production facility. for the Municipal Indoor Swimming Pool, diagnosing operating problems and verifying whether the project, technical management and execution of…

Leer el artículo