Work has already begun on the new 450 kW solar photovoltaic plant in Marchena (Seville), where Irradia Energía is acting as EPC, carrying out the development, processing, engineering, construction, project management and commissioning.
This new one-hectare plant will have 1,092 photovoltaic modules with a peak power of 600 kWp, and the structure will be driven directly into the ground.
Irradia thus continues to contribute to the change in the country’s energy model by prioritizing the production of electricity from renewable energy sources.