Irradia Energía is collaborating with Ferrovial in the construction of the Giralda Center Hotel through the development of the facilities project in a BIM environment.
The project for this hotel was originally developed in CAD and Ferrovial wanted the support of this work methodology to detect incidents before the start of the works.
A first model of the facilities was prepared, as well as a simplified model of the architecture and structure based on the CAD drawings of the execution project, and as a result, conflicts that would have caused a delay in the construction work were detected.