Irradia Energía performs the engineering and construction management for the installation of a new heat pump at the Marie Curie Technoincubator in Seville.
PCT Cartuja contracted Irradia Energía to prepare the “Execution Project for the replacement of the water-water chiller plant”, as well as the Works Management, in the Marie Curie Tecnoincubator building, located in Isla de la Cartuja in Seville. This project includes the replacement of an old water-to-water heat pump that supplied cold/heat to the main areas of the business building, with a new water-to-air heat pump to be located on the roof of the building, for which it has been necessary to include a metal structure to support it. The new hydraulic circuit that will connect the new heat pump on the roof with the distribution pumps located in the technical room in the basement has also been incorporated.
The works, carried out by the company Guadalclima, are currently underway and are expected to be completed by the end of this year with the commissioning of the new facility.