Irradia successfully completes the photovoltaic installation for self-consumption in the Political Building B of the Malaga Provincial Council
Irradia Energía, as the company awarded the public contract OP-PA.-16/22, completes the execution of the 195 kWp and 180 kWn photovoltaic installation, which will provide 278,760 kWh per year.
The installation has been designed on the roof of the Political Building B with TIER1 modules. This roof has improved its safety with the installation of perimeter railings for both the exterior and the patio area. The entire execution has been carried out following an aesthetic criterion and with less visual impact for this emblematic building.
Irradia Energía makes its contribution to the Malaga Provincial Council joining the list of public buildings that are moving towards a just energy transition.