Energy audit of the thermal installations of the municipal swimming pool of Castilleja de la Cuesta.

Energy audit of the thermal installations of the Castilleja de la Cuesta municipal swimming pool. Castilleja de la Cuesta – Seville Preparation of a technical report on the operating conditions of the hot water production facility. for the Municipal Indoor Swimming Pool, diagnosing operating problems and verifying whether the project, technical management and execution of…

Design and installation of monitoring units for solar thermal energy installations.

Design and installation of monitoring units for solar thermal energy installations. Malaga, Toledo and Guadalajara. Design and installation of monitoring control panels for solar thermal energy installations, 10 installations in the province of Malaga, 2 in Toledo and 1 in Guadalajara. The total of these facilities exceeds 1100m2 of catchment area and has a total…

Sagra Project: R&D

In consortium with Schneider Electric and GPtech, Irradia started a promising project thanks to the INNTERCONECTA program (ITC-20151067). With the growing demand for renewable energy generation systems, both nationally and internationally, and with the intrinsic intermittency due to sudden changes in the weather, there is a need for the integration of storage systems in a…