moron

Alonsolar Morón Solar Park: Promotion, Engineering and Execution

Moron de la Frontera – Seville

Irradia Energía is carrying out the complete development of the project, which includes the engineering, development, commercialization and construction of a 2.1 MWp solar farm located in Morón de la Frontera (Seville). Construction began in February 2008 and connection was made in September 2008.