Instalación fotovoltaica en Mercamálaga

Irradia Energía completes the execution of the contract for the photovoltaic installation of shared self-consumption for Mercamálaga

Irradia Energía completes the execution of the contract for the photovoltaic installation of shared self-consumption for Mercamálaga Irradia Energía, as the company awarded the works contract submitted to public tender, completes the execution of the 101.1 kWp and 100 kWn photovoltaic installation, which will provide approximately 142,000 kWh per year. This annual production will be…

Leer el artículo
tecno incubadora

Irradia Energía performs the engineering and construction management for the installation of a new heat pump at the Marie Curie Technoincubator in Seville.

Irradia Energía performs the engineering and construction management for the installation of a new heat pump at the Marie Curie Technoincubator in Seville. PCT Cartuja contracted Irradia Energía to prepare the “Execution Project for the replacement of the water-water chiller plant”, as well as the Works Management, in the Marie Curie Tecnoincubator building, located in…

Leer el artículo
Diputación Sevilla

IRRADIA AWARDED THE PUBLIC TENDER FOR THE MALAGA PROVINCIAL COUNCIL

Irradia Ingeniería Solar has been awarded the contract through a public tender for the construction of the 192 kWp rooftop photovoltaic installation for self-consumption of the Political Building B of the Provincial Council of Malaga. The building in question is an emblematic and representative building of the new Malaga architecture, designed by “Luis Machuca y…

Leer el artículo